Daikin BSVQ96PVJU Manual do Utilizador Página 6

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 5
Individual branch selector for VRV
®
heat recovery • BSVQ-P8
Accessories • Individual branch selector for VRV
®
heat recovery
4
4 Dimensional drawing & centre of gravity
4 - 1 Dimensional drawing
BSVQ100PV1
3D056011
NOTES
1 Electric box can also be fixed on the other side of the unit.
2 Be sure to install an inspection door at electric box side.
3 Attached pipe is only used in case of connecting with a 20~50
class indoor unit.
4 Small sound of refrigerant will be made, which may be
disturbing.
Do not install it at the place such as bedroom under roof.
Nr Name Description
1 Suction gas pipe connection port ø15.9mm brazing connection
2 HP/LP gas pipe connection port ø12.7mm brazing connection
3 Liquid pipe connection port ø9.5mm brazing connection
4 Gas pipe connection port ø15.9mm brazing connection
5 Liquid pipe connection port ø9.5mm brazing connection
6 Electric box (note 1.)
7 Suspension brackets M8 ~M10
8 Grounding terminal M4
9 Attached pipe (1) (Note. 3) ø12.7mm brazing connection
10 Attached pipe (2) (Note. 3) ø6.4mm brazing connection
(Suspension bolt pitch)
250 or more
(Suspension bolt pitch)
(Servicing space)
Servicing space
300 or more
(Servicing space)
Inspection door
(Note 2.)
Location of unit’s name plate - - - right side of electric box
65
or
more
(Servicing
space)
(Servicing space)
250 or more
(Servicing space)
(Servicing
space)
50 or
more
(In case of use attached pipe)
BSVQ160PV1
3D058004
NOTES
1 Electric box can also be fixed on the other side of the unit.
2 Be sure to install an inspection door at electric box side.
3 Attached pipe is only used in case of connecting with indoor unit
capacity index 150 or more and 160 or less.
4 Small sound of refrigerant will be made, which may be
disturbing.
Do not install it at the place such as bedroom under roof.
Nr Name Description
1 Suction gas pipe connection port ø15.9mm brazing connection
2 HP/LP gas pipe connection port ø12.7mm brazing connection
3 Liquid pipe connection port ø9.5mm brazing connection
4 Gas pipe connection port ø15.9mm brazing connection
5 Liquid pipe connection port ø9.5mm brazing connection
6 Electric box (note 1.)
7 Suspension brackets M8 ~M10
8 Grounding terminal M4
9 Attached pipe (1) (Note. 3) ø19.1mm brazing connection
10 Attached pipe (2) (Note. 3) ø15.9mm brazing connection
(Suspension bolt pitch)
250 or more
(Suspension bolt pitch)
(Servicing space)
Servicing space
Inspection door
(Note 2.)
Location of unit’s name plate - - - right side of electric box
250 or more
(Servicing space)
65
or
more
(Servicing
space)
350 or more
(Servicing space)
350 or more
(Servicing space)
(In case of use Attached pipe)
(Suspension bolt pitch)
50
or
more
(Servicing
space)
(Note 1.)
Vista de página 5
1 2 3 4 5 6 7 8 9 10 11 12

Comentários a estes Manuais

Sem comentários